GridGuard unifies FERC, NERC, CPUC, WECC, CAISO, and GO 95/128 obligations into a single AI-powered platform. From RSAW documentation and CIP controls to mitigation plan tracking and executive dashboards — built for the compliance demands of electric-only IOUs.
Electric utilities in the Western US face a uniquely complex regulatory environment — FERC wholesale tariff obligations, NERC reliability and CIP cybersecurity standards, CPUC state safety requirements, WECC regional audits, CAISO market compliance, and GO 95/128 construction standards. Each regulator has its own audit cycle, documentation format, and enforcement posture.
GridGuard replaces disconnected spreadsheets, shared drives, and manual tracking with a single platform that maps every obligation, monitors every deadline, and generates audit-ready documentation — so your compliance team can focus on managing risk, not managing files.
340+ NERC Standards Tracked
87% Avg. Compliance Score Improvement
60% Reduction in Audit Prep Time
6 Regulatory Bodies Covered
Purpose-built modules for every FERC, NERC, CPUC, WECC, CAISO, and GO 95/128 obligation — unified in one platform with shared evidence, cross-module AI analysis, and a single audit trail.
Centralized repository for Reliability Standard Audit Worksheets. AI-assisted narrative generation, version control, and audit-ready export in NERC-compliant formats.
End-to-end lifecycle management for WECC mitigation plan filings — submission status, regulatory responses, and corrective action milestones.
Automatically identifies gaps between your current controls and NERC, FERC, CPUC, WECC, and CAISO requirements. Generates prioritized remediation roadmaps.
Structured test plan management for CIP cybersecurity controls. Tracks control testing schedules, findings, and remediation status across all BES Cyber Systems.
Asset-level inspection cadences for poles, conductors, manholes, and vaults. Flags overdue circuits and generates CPUC-compliant inspection reports.
Live compliance health score, obligation status heatmaps, upcoming deadline calendars, and audit readiness indicators — built for leadership reporting.
Real-time alerts when FERC orders, NERC standards, CPUC rulings, or WECC bulletins are issued. AI summarizes impact on your specific compliance obligations.
Manages regulatory data requests (DRU) with workflow routing, confidentiality classification, approval chains, and response deadline tracking.
GridGuard is purpose-built for the complex, overlapping regulatory environment faced by California and Western US electric utilities — covering every major federal and state compliance body.
Wholesale tariffs, transmission licensing, enforcement actions, and market oversight.
O&P standards, CIP cybersecurity, reliability standards, and audit programs.
State safety obligations, GO 95/128, OEIS requirements, and rate cases.
Regional entity audits, mitigation plan filings, and reliability assessments.
OATT compliance, transmission control agreements, and AMR filings.
Construction standards for overhead and underground electrical supply lines.
Designed for operators like
Measured results across NERC, FERC, CPUC, WECC, and CAISO compliance programs using GridGuard.
Reduction in Audit Prep Time
AI-assisted RSAW generation replaces weeks of manual narrative drafting
NERC Standards Tracked
Full coverage of O&P, CIP, FAC, MOD, PRC, IRO, and COM reliability families
Compliance Score Improvement
Average improvement measured across electric utility programs after one year
Fewer Missed NERC Deadlines
Automated 30-day advance alerts and obligation calendar eliminate manual tracking
Metrics based on program-level outcomes observed across GridGuard deployments at large investor-owned utilities and transmission operators.
Join electric utilities across the Western US using GridGuard to manage FERC, NERC, CPUC, WECC, CAISO, and GO 95/128 obligations in one AI-powered platform.
Also available: Gas Distribution and Combination Utility plans